News by keyword
News about NevGold
1 story tagged with this keyword.
- NevGold Extends Oxide Mineralization By Over 100 Meters: 7.27 g/t AuEq Over 3.0 Meters (6.18 g/t Au, 0.28% Sb) Within 1.55 g/t AuEq Over 32.0 Meters (0.92 g/t Au, 0.16% Sb); And 8.04 g/t AuEq Over 3.0 Meters (0.36 g/t Au, 1.98% Sb) Within 0.42% Sb Over 42.7 Meters
NevGold Corp. (TSXV: NAU) reported additional gold-antimony assays from its 2026 drill program at the Limousine Butte Project in Nevada. Mineralization has been extended more than 100 meters east of the Resurrection Ridge resource, both inside and outside the 2026 Mineral Resource Estimate pit-shell released on July 15, 2026. Highlights include LB26-011 with 7.27 g/t AuEq over 3.0 meters and LB26-008 with 8.04 g/t AuEq over 3.0 meters, plus LB26-015 expanding mineralization inside the pit-shell. About 50 holes and 12,000 meters have been completed, with 38 holes still awaiting assays, and the company reports over $43 million in treasury. A Preliminary Economic Assessment is targeted for completion in Q1-2027.
Get the briefing on Telegram or Zalo
Join the Upside Telegram channel or Zalo group for the Vietnam stocks and gold briefing at 8:00 and 19:00 (Vietnam time) on trading days, plus a weekly wrap on Saturday morning.