At a seminar co-organized by Tien Phong newspaper and the HCMC Department of Construction on October 16, TS. Phạm Viết Thuận said the city should treat infrastructure as an integrated system rather than focusing only on transport. He argued that 11 main and 13 secondary infrastructure categories, including power, water drainage, industrial zones and logistics, need to be synchronized for the city to develop its economy. To address flooding, he proposed surveying 159 flood-prone points and building ecological lakes at major spots. He also noted that four large corporations had considered investing in Vietnam but withdrew when asked about grid power capacity. Department director Trần Quang Lâm said capital mobilization and land policy need further study, while traffic congestion, flooding and pollution remain the city’s top priorities.
Summary written by Upside AI from the original article. Read the source for full details.
Original headline: Viện trưởng Viện KT-TN&MT TPHCM: Vừa có 4 tập đoàn lớn đặt vấn đề đầu tư vào Việt Nam, nhưng họ rút lui khi hỏi về công suất điện
Keywords
NT2electricityVietnaminfrastructure
Open a keyword to see other news on the same topic.
Related tickers and likely impact
NT2
▲ Likely positiveNhon Trach 2 Power
Relevance: low
| Market | Vietnam stocks |
|---|---|
| Exchange | HOSE |
| Sector | Utilities |
| Industry | Electricity |
| Market cap | 6,708 bn VND |
| P/E | 5.3 |
| P/B | 1.34 |
| Close on 10/19/2026 | 23.35 |
| Change that session | +0.21% |
POW
▲ Likely positivePV Power
Relevance: low
| Market | Vietnam stocks |
|---|---|
| Exchange | HOSE |
| Sector | Utilities |
| Industry | Electricity |
| Market cap | 37,428 bn VND |
| P/E | 6.3 |
| P/B | 0.91 |
| Close on 10/19/2026 | 12.25 |
| Change that session | +0.41% |
VNINDEX
• NeutralRelevance: low
| Market | Vietnam stocks |
|---|---|
| Close on 10/19/2026 | 1,689.84 |
| Change that session | -0.94% |
Impact is scored by AI from the headline and may be wrong. It is not investment advice.
Related news
- Prime Minister: Cutting intermediary layers in fuel and electricity distribution
Prime Minister Lê Minh Hưng said the government will amend the fuel business decree and restructure the electricity sector to cut intermediary layers and lower input costs for the economy. The draft fuel decree would reduce trader categories to four, and the number of wholesalers is expected to fall to 14-15 under stricter rules, such as owning at least 40 retail stores and storage capacity of at least 15,000 m3. The PM said nine-month inflation was held at 4.52%, but world fuel prices rose 65% to nearly 90%, and without tax adjustments domestic fuel prices could rise 60-80%. Vietnam's fuel prices are low compared with regional peers, and the budget faces a major revenue shortfall, though the government still implements these measures to share the burden with the economy and consumers. The EVN restructuring plan is being submitted to the government, and land and property prices may fall once the amended Land Law is passed.
- Prime Minister: Cutting Intermediary Stages in Fuel, Electricity and Healthcare Distribution
Prime Minister Lê Minh Hưng said the government will cut intermediary stages in fuel distribution, electricity and healthcare to lower input costs for the economy. The draft new fuel-business decree would reduce the main trader types to 4 and tighten conditions for wholesale traders, with their number expected to fall to 14-15. In healthcare, the government will amend the Law on Medical Examination and Treatment and the Pharmacy Law to remove intermediaries, as medical equipment and drugs have been marked up through overseas intermediary transactions. According to the government's report, inflation was held at 4.52% after 9 months, but world oil prices rising 65% to nearly 90% could push domestic fuel prices up 60-80% without tax adjustments.
- Standing Member of the Party Secretariat: Electricity prices should fall, and rise only if costs increase
Standing Member of the Party Secretariat Trần Cẩm Tú said the General Secretary and State President has asked the government to review electricity prices with the aim of cutting them, raising them only if costs increase, while keeping inflation below 4.5%. He called for tight control of fuel, electricity and water prices, efforts to lower lending rates, and timely land and capital policies for private businesses. On education, he said the shortage of about 100,000 teachers has improved after school restructuring, and a textbook problem is under investigation as directed by the Politburo. The government is also tasked with finalizing job position, staffing and pay plans in Q4 2026. Quảng Ninh Party Secretary Quản Minh Cường argued the 10% growth target should not apply to every province, citing Cao Bằng.
- French Group Alstom Receives €800 Million Metro Train Order from Vingroup
Alstom has received the first order from Vingroup worth about €800 million (nearly VND 24,000 billion) for Metropolis trains serving Hanoi metro lines, according to an investor report on October 19. The company will book the order in its fiscal 2026-2027 third-quarter results but has not disclosed the number of trains in this first order or the total contract value. Under the agreement signed October 6, the first 83 trains will be built by Alstom in Valenciennes, France, while the remaining 117 will be assembled in Vietnam using Alstom technology and key components. Vingroup, through Vinhomes, is general contractor for five metro lines totaling 303.5 km; the Vinhomes-SGC joint venture signed the contract on October 15, with a package value of about VND 920,000 billion, of which Vinhomes expects to take at least 60%, with completion targeted for 2030.
- Irresponsible House budget
The People’s Budget Coalition (PBC) says the House-approved P7.2-trillion 2027 national budget contains P1.06 trillion in “red flag” allocations, including pork barrel projects and handouts it considers vulnerable to political patronage ahead of the 2028 election. The House reportedly cut P34.7 billion from the Metro Manila Subway and the North-South Commuter Railway, P53.5 billion from foreign-assisted bypass roads and highways, and P4.9 billion from DOH immunization, while redirecting P54 billion to local District Engineering Offices. Delays in foreign-assisted projects are adding costs; Finance Secretary Frederick Go said the government accumulated P3.4 billion in commitment fees from 2022. DOTr, seeking P12.8 billion to buy LRT-2 trains, is allowing public utility buses along the line as a temporary measure. Senate finance committee chair JV Ejercito pledged to restore and protect funding for the subway and railway lines.
- Norway sovereign wealth fund should invest in major defence groups , commission concludes
A government-appointed commission recommended allowing Norway's $2.3 trillion sovereign wealth fund to invest in major Western defence groups such as Airbus, Boeing, BAE Systems and Lockheed Martin, which are currently excluded over nuclear arms involvement. The proposed exemption would cover companies based in NPT nuclear-weapon states that are allied with NATO, potentially leading to tens of billions of dollars in investments if the government and parliament adopt it. The commission also proposed keeping the Council on Ethics but ending automatic publication of its reports, while the Norwegian Red Cross said the change would legitimise investment in weapons of mass destruction. The government will make its own decision in an annual white paper expected in spring 2027.
Related markets
Latest news
- TRX Gold to Present at Red Cloud's Fall Mining Showcase 2026
TRX Gold will present at Red Cloud's Fall Mining Showcase 2026, an in-person conference at the Omni King Edward Hotel in Toronto on October 28 and 29, 2026. Stephen Mullowney is scheduled to present on Thursday, October 29, 2026 at 12:00 PM Eastern. The release describes the company as a gold producer advancing the Buckreef Gold Project in Tanzania, which includes an established open pit and a 2,000 tonnes per day plant. The May 2025 PEA outlines average annual gold production of 62,000 oz over 17.6 years.
- Tesla Stock vs. the S&P 500: Which Investment Wins Through 2030?
The article argues Tesla trades at roughly 203 times this year's expected earnings and 13 times expected sales, a valuation that looks very expensive given gross margin pressure and a slower-than-expected robotaxi rollout. The flying Roadster, slated for production in 2028, is unlikely to make a meaningful sales or earnings contribution before 2030. The author thinks a Tesla-SpaceX merger by the end of the decade, likely an all-stock deal, is more likely than not and would be a key factor in how Tesla stock performs against the S&P 500 through 2030.
- SpaceX surprises Wall Street with Oct. 20 earnings date — here's why
SpaceX (SPCX) will release earnings on Oct. 20 after the market close, a surprise since earnings dates are usually shared weeks in advance. Evercore ISI analyst Kutgun Maral says possible reasons include putting updated financials on record before new financing or getting ahead of major lock-up releases, though scheduling is also possible. Reuters reported SpaceX is seeking $40 billion in financing to buy advanced Nvidia AI chips, including about $10 billion in bank loans and $30 billion in investment-grade debt, with Apollo expected to lead. The lock-up schedule includes 1.30 billion shares two days after earnings, 329 million on 10/24, and a remaining 857 million tranche of the 180-day group.
- AEP Partners with Amazon and X-energy to Explore Advanced Nuclear Energy in Indiana
American Electric Power (AEP) has announced a joint development agreement with X-energy to evaluate the feasibility of a 960-megawatt advanced nuclear project at a former coal plant site in Sullivan County, Indiana. Amazon is supporting development through a funding agreement. If the project reaches a final investment decision and is built, Amazon intends to buy the power under a long-term contract covering the facility's costs and operations. The initial project would include 12 Xe-100 units of 80 MW each, and the companies say it could create jobs, expand the local tax base and strengthen the grid for more than 60 years. AEP says the agreements include the financial safeguards it considers essential for any nuclear project to move forward.
- Talamore Marks One Year at Coffee with Major Advances Toward a 2027 Construction Decision
Talamore Mining marks one year since closing its acquisition of the Coffee Gold Project in Yukon, Canada, from Newmont Corporation on October 17, 2025. The company has assembled a financing package of up to C$688 million, including a C$149.5 million equity offering, a C$450 million secured project debt facility and up to C$88 million from a warrant early-exercise program. A primary road permit received in August 2026 allows completion of the 214-kilometre Northern Access Route from Dawson City. The February 2026 Preliminary Economic Assessment outlined a 13-year open-pit heap leach mine with an after-tax NPV (5%) of US$2.3 billion and an after-tax IRR of 47.8%. G Mining Services is completing the Feasibility Study, expected in Q1 2027, ahead of a construction decision targeted for the first half of 2027.
- Tiger Gold Extends Mineralization to the South at Ceibal, Drilling 268 m @ 0.5 g/t Au from Surface
Tiger Gold reported assay results from hole CEDDH-023 at its Ceibal target within the Quinchía Gold Project in Colombia. The hole intersected 268 metres grading 0.5 g/t Au from surface, extending mineralization south into a previously untested part of the corridor. Mineralization remains open to the west and southwest, where additional holes are testing for extension, and assays from Ceibal and Tesorito are pending. The drilling is intended to support a maiden Mineral Resource estimate, targeted for near the end of Q1 2027.
Get the briefing on Telegram or Zalo
Join the Upside Telegram channel or Zalo group for the Vietnam stocks and gold briefing at 8:00 and 19:00 (Vietnam time) on trading days, plus a weekly wrap on Saturday morning.